DoyonTek DYT-PA4545-MCCB-350A | 48-Way 3-Phase Mining PDU

DoyonTek 48-way 3-phase mining PDU for S21/T21/P34. Supports 480V/277V input, delivering efficient rack-mount power distribution for high-density miners.

Main Specifications

Rated Current 250A, 350A
Number of Sockets 45, 48
Application mining
Usage Server Rack/mining facility
Quantity:

Technical Parameters

Rated Current 250A, 350A
Rated Voltage 220V Electrical Equipment, 230 V, 240 V, 380 V, 400 V, 415 V, 480 V, 277V
Application Industrial, Indoor, server room, Data center
Number of Sockets 45, 48
Application mining
Color Customized Color
Material Metal
Usage Server Rack/mining facility
Size 2200x390x255mm

Product Details

High-Efficiency Power Distribution for Crypto Mining

The DoyonTek DYT-PA4545-MCCB-350A is a premium 48-way 3-phase PDU engineered specifically for high-density cryptocurrency mining operations. With support for 480V/277V input, this unit provides stable and robust power delivery for the latest generation of high-power miners.

Key Features:

  • High Power Capacity: Rated for 250A/350A, ensuring your mining farm stays powered even under peak loads.

  • Advanced Protection: Equipped with a Molded Case Circuit Breaker (MCCB) to safeguard equipment against overcurrent and short circuits.

  • Optimal Compatibility: Seamlessly powers high-performance miners including Bitmain Antminer S21, T21, P13, P34, and other PA45-compatible units.

  • Rack-Mount Design: Vertical (0U) installation saves valuable space in your server cabinets, optimizing airflow and cooling.


FeatureSpecification Details
Circuit BreakerHigh-Performance Molded Case Circuit Breaker (MCCB)
Power Input3-Phase 380V - 480V (Supports 277V)
Socket Type48-Way PA45 Connectors (Optimized for Mining)

Frequently Asked Questions (FAQ)

  • Q: Which miner models are compatible with this PDU?

    • A: The DYT-PA4545-MCCB-350A is fully compatible with Bitmain Antminer S21, T21, and various P-series models requiring PA45 connectors.

  • Q: Does it support 480V input?

    • A: Yes, it supports 3-phase 480V/277V input, making it ideal for large-scale industrial mining facilities.

  • Q: What is the lead time for bulk orders?

    • A: For orders between 1-50 units, the lead time is approximately 21 days. For larger quantities, please contact our sales team.


The DoyonTek DYT-PA4545-MCCB-350A is a premium   48-way 3-phase PDU   engineered specifically for high-density   power distribution unit   solutions in cryptocurrency operations.


As the core of industrial mining power solutions, the DYT-PA4545-MCCB-350A is optimized for 24/7 continuous operation in high-temperature environments. It ensures that your investment in server rack density is protected by industry-grade safety standards.


DYT-PA4545-MCCB-350A DoyonTek PDU

DoyonTek DYT-PA4545-MCCB 350A 3-Phase Mining PDU Front View DYT-PA4545-MCCB-350A DoyonTek PDU slanted placement effect diagram MCCB Circuit Breaker Detail on DoyonTek 350A PDU DYT-PA4545-MCCB-350A DoyonTek PDU Bottom detail image Power Input and Socket Distribution of DoyonTek 48-way PDU

Customer Reviews

>> More

Purchase Information

Minimum order quantity (MOQ)

1 unit (Sample orders are accepted)

Bulk orders enjoy discounted prices.

Payment methods

Accepted Currency:USD,EUR,CAD,AUD,HKD,CNY

Accepted Type: T/T,PayPal,Cash

Accepted Delivery Terms

Sample order:3-5 business days

Bulk orders:

1 ~ 50 21 days
51 ~ 100 30 days
≥101 Negotiation is required.

Accepted Delivery Terms: FOB,EXW,DDP,Express Delivery