High-Power PDU | 72KW 12-Port 3phase PA45 100A for IDC & Crypto Mining

Industrial-grade 72kW PDU engineered for AI data centers and high-density mining. Features 12 independent 100A/125A MCB protection circuits and high-conductivity copper busbars for 24/7 full-load stability. ETL & RoHS certified to meet rigorous global safety and insurance compliance standards.

Main Specifications

Rated Current 100 A
Rated Voltage 400 V, 380 V, 230 V, 415 V, 220V Electrical Equipment, 240 V
Color Customized Color
Number of Sockets 12
Quantity:

Technical Parameters

Rated Current 100 A
Rated Voltage 400 V, 380 V, 230 V, 415 V, 220V Electrical Equipment, 240 V
Color Customized Color
Number of Sockets 12
Material Cold-rolled Steel / Powder-coated Aluminum
Usage Mining/data center
Application Industrial, Indoor, Data center, server room, crypto miner etc
Size 1450x210x180mm
Circuit Breaker Hydraulic-Magnetic or Thermal MCB
Warranty 1year
Mount Horizontal/Vertical Mounting

Product Details

High-Density 72kW Power Management for AI & Crypto Infrastructure

The DoyonTek 72kW Industrial PDU is a heavy-duty power distribution solution engineered for high-demand environments. With a robust 100A-125A MCB (Miniature Circuit Breaker) system, this unit provides centralized protection for up to 12 high-power devices, making it the gold standard for 2026-gen GPU mining clusters and small-scale IDC server rooms.

Key Engineering Advantages:

  • Extreme Load Capacity: Supports up to 72kW total output, designed to handle the continuous thermal load of Antminer S21, T21, or AI server racks.

  • Safety Certified: Fully compliant with ETL and RoHS standards, ensuring international safety compliance for insurance and industrial inspections.

  • P33 LV Standard: Optimized for low-voltage power distribution with high-conductivity copper busbars to minimize heat generation.

  • Individual Port Protection: Each of the 12 ports is backed by dedicated circuit protection to prevent localized faults from bringing down the entire rack.

Designed for Small Computer Rooms & IDC:

The compact metal housing (1450x210x180mm) allows for versatile mounting. Whether you are managing a Small Computer Room or a high-density IDC data center, the DoyonTek circuit breaker box simplifies cable management and enhances electrical safety.

Frequently Asked Questions

Q: Can this 72kW PDU support 24/7 continuous full-load operation?

A: Yes, the DoyonTek 72kW unit is designed with high-purity copper components and industrial-grade MCBs to handle 100% continuous duty cycles in mining and IDC environments.

Q: Does it come with the ETL certification labels for inspection?

A: Absolutely. All units are shipped with official ETL and RoHS certification markings, ensuring they meet the safety requirements for professional data centers.


Industrial-Grade Architecture

125A Main Breaker

Master protection with high breaking capacity for emergency shut-off.

Copper Busbar

99.9% pure copper connectivity to handle 72kW without overheating.

IP20 Protection

Cold-rolled steel enclosure for harsh industrial environments.


72kW 12-Port PDU Main View with 100A MCB ETL Certified Power Distribution Unit - Rear View Internal Circuit Breaker Box Detail for IDC Room Internal Circuit Breaker Configuration for Mining PDU DoyonTek 72kW PDU Front Panel with 12-Port MCB 72kW Power Distribution Box Side View - Metal Housing

Customer Reviews

>> More

Purchase Information

Minimum order quantity (MOQ)

1 unit (Sample orders are accepted)

Bulk orders enjoy discounted prices.

Payment methods

Accepted Currency:USD,EUR,CAD,AUD,HKD,CNY

Accepted Type: T/T,PayPal,Cash

Accepted Delivery Terms

Sample order:3-5 business days

Bulk orders:

1 ~ 50 21 days
51 ~ 100 30 days
≥101 Negotiation is required.

Accepted Delivery Terms: FOB,EXW,DDP,Express Delivery