Doyontek 45kW Smart Mining PDU | 12-Port C19 | 3-Phase 63A Remote Control

Doyontek 45kW Mining Smart PDU 12-Port C19 Metal Power Distribution Unit 3-Phase 63A with Monitoring & Remote Control

$ 285-315

Main Specifications

Rated Current 32 A, 63 A, 15 A, 16 A, 50 A, 80 A, 10A
Rated Voltage 400 V, 380 V, 415 V
Color Customized Color
Material Metal
Usage Server Rack
Quantity:

Technical Parameters

Rated Current 32 A, 63 A, 15 A, 16 A, 50 A, 80 A, 10A
Rated Voltage 400 V, 380 V, 415 V
Color Customized Color
Material Metal
Function(Optional) Monitoring and Remote Control
Usage Server Rack
Application Industrial, Indoor, Data center, server room, Mining
Size 1889x58x70mm

Product Details

Professional Intelligent Power Management

The Doyontek 45kW Smart PDU is designed for the high-intensity requirements of modern crypto mining farms and data centers. With a 63A 3-phase input, it delivers massive power density while maintaining granular control.

  • Remote Management: Integrated web interface for remote outlet switching and real-time monitoring.

  • High Capacity: 45kW total power rating, ideal for high-wattage ASIC miners.

  • Durable Construction: Industrial-grade metal housing for superior heat dissipation.

  • Network Support: Supports SNMP, HTTP, and Telnet protocols for seamless data center integration.

Power Capacity & Load Management

For continuous 24/7 operation in high-density environments, we recommend the 80% load rule.

Input VoltageMax CapacityRecommended Continuous Load (80%)
3-Phase 380V41.4 kW33.1 kW
3-Phase 400V43.6 kW34.9 kW
3-Phase 415V45.3 kW36.2 kW

Note: The 12-port C19 configuration allows for high-wattage ASIC connectivity. Ensure cables are rated for the appropriate amperage.


Common Questions (FAQ)

1. How many miners can I connect to this 45kW PDU?

Depending on your miner's wattage (e.g., 3500W), you can safely connect 10-12 units while remaining within the recommended 80% safety threshold.

2. Does it support remote reboot of individual outlets?

Yes, the "Smart Switched" version allows you to remotely power cycle each of the 12 C19 outlets via the web interface or SNMP.

3. What is the lead time for 100+ units?

For bulk orders exceeding 100 units, the standard production time is 30+ days, but we recommend contacting our sales team for the most accurate current schedule.

4. Can this PDU handle Bitmain Antminer S21/T21?

Yes, the 12-port C19 high-density design and 45kW capacity are specifically optimized for the latest generation of liquid-cooled and air-cooled miners.

5. What protocols are supported for remote control?

Our Smart PDUs support SNMP v2/v3, HTTP/HTTPS, and MQTT for integration with data center management software.


Doyontek 45kW Smart PDU Front View with C19 Outlets Smart PDU 12-port C19 3-Phase 63A Smart PDU Monitoring Display Panel Smart PDU 12-port C19 Smart PDU 12-port C19 Smart PDU 12-port C19 Smart PDU 12-port C19 Smart PDU 12-port C19 Industrial 0U Vertical Rack Mount PDU for Mining

Customer Reviews

>> More

Purchase Information

Minimum order quantity (MOQ)

1 unit (Sample orders are accepted)

Bulk orders enjoy discounted prices.

Payment methods

Accepted Currency:USD,EUR,CAD,AUD,HKD,CNY

Accepted Type: T/T,PayPal,Cash

Accepted Delivery Terms

Sample order:3-5 business days

Bulk orders:

1 ~ 50 21 days
51 ~ 100 30 days
≥101 Negotiation is required.

Accepted Delivery Terms: FOB,EXW,DDP,Express Delivery